• Register
ein

Dolphin Energy issues tender documents for Taweelah-Fujairah Gas Pipeline project

United Arab Emirates: Sunday, November 11 - 2007 @ 10:35

The Taweelah to Fujairah Gas Pipeline (TFP) will be 48 inches in diameter and over 240 kilometers in length – one of the longest and largest overland pipelines in the UAE.

The TFP will link Dolphin Energy’s gas receiving facilities at Taweelah, on the coast of Abu Dhabi, with the ADWEA Power and Water Desalination Plant at Qidfa, in Fujairah.

Bids for the TFP design and build project are due by January 31, 2008. The award is likely to be made during next summer, with site work expected to begin during third quarter 2008.

The nine contracting companies that have been invited to bid are Al Jaber Energy, UAE; Consolidated Contractors Company, Greece; CPECC, China; Dodsal, India; Petrojet, Egypt; Snamprogetti, Italy; STG, Russia; Techint, Saudi Arabia; and Technip, Germany.

Dolphin Energy currently supplies the Qidfa plant with up to 135 million standard cubic feet of gas per day via Al Ain-Fujairah Pipeline, which the company commissioned in January 2004. The new TFP pipeline will support ADWEA’s proposed expansion and development program at Qidfa, Fujairah.

Today's Top Stories

Posted by

Sunday, November 11- 2007 @ 10:35 UAE local time (GMT+4) Replication or redistribution in whole or in part is expressly prohibited without the prior written consent of Mediaquest FZ LLC.

AME Info Services





Business DirectoryVIEW ALL

Search by name

Search by industry

Browse alphabetically



JobsVIEW ALL

Search for jobs

Latest Jobs