ein

United Pioneering Business signs agreement to supply Samsung central AC to resort project and lake hotel at Dead Sea

Jordan: Saturday, June 04 - 2011 @ 15:36

The resort is the largest lake, hotel resort, and tourist hotel in the Dead Sea area. It is one of the most important projects in the region with an area of up to 218 thousand square meters, consists of a thousand suites, and a lake water area of 40 thousand square meters.

Last year, Samsung launched the VRF fourth-generation systems, which is characterized by the highest cooling capacity in the world up to 80HP and an efficiency up to 4.57, providing a huge reduction of electricity consumption compared to other air conditioning systems. It also incorporates thinner interior units, which reaches the thickness of the internal unity of type (One way cassette type) to 13.5 cm and the unity of air-conditioning of the type of DECT (Ducted Type) to 19.9 cm. These dimensions make the Samsung VRF a friend to the interior architects and architecture and not a burden on their designs. This is due to Samsung’s high flexibility of installation of large projects and the pipes between the internal and external units are up to 1000 meters and have a high temperature carrying capacity up to 60 degrees Celsius.

United Pioneering Business has recently established, in collaboration with Samsung, a specialized center for servicing and maintenance of air conditioning, which is unique of its kind in the Jordanian market and the region.

Riziq Bani Hani, Chairman and CEO of Turath Tourism, said, “The project is being implemented under the supervision of local and international companies contracting with qualified contractors from inside Jordan and abroad to ensure the proper implementation of the high artistic specifications and doing so in the limited time allowed.”

He also added that, “The project provides opportunities for investment within a modern and luxurious touristic project that corresponds with Arab, family, and Islamic values. The anticipated completion of construction work of the first stage will be delivered to the owners of the resort suites at the beginning of 2012.”

Today's Top Stories

Posted by

Saturday, June 4- 2011 @ 15:36 UAE local time (GMT+4) Replication or redistribution in whole or in part is expressly prohibited without the prior written consent of Mediaquest FZ LLC.

AME Info Services







Business DirectoryVIEW ALL

Search by name

Search by industry

Browse alphabetically






JobsVIEW ALL

Search for jobs

Latest Jobs