• Register
ein

MENAdrill raises three year Islamic financing

Bahrain: Thursday, March 08 - 2012 @ 12:27

MIC took delivery of its first rig MENAdrill I in November 2010 from Maritime Industrial Services ‘MIS’ yard in Sharjah, U.A.E. and the rig was subsequently mobilized to Mexico for operating under a contract with PEMEX, the national oil and gas company for the Government of Mexico.

MENAdrill I is a mobile, offshore self elevating Friede and Goldman designed Super M2 Jack-Up rig with capability to operate in a water depth of up to 300ft and with rated drilling depth of up to 30,000 ft.

The construction of the second rig namely ‘MENAdrill II’ has similar technical specifications as MENAdrill I and was successfully constructed with the rig delivered by MIS in March 2011. During the last 3 years since inception, MIC has passed through an extremely challenging global economic environment. Despite these turbulent market conditions, MIC has emerged successfully.

“MENAdrill I is successfully operating and we have signed a charter contract for MENAdrill II which has already been mobilized to Mexico and is expected to commence operations by next month in the Gulf of Mexico under a contract with PEMEX“ stated Mr. Mohamed Ghanem, Acting CEO of First Energy Bank (BSC) and Chairman of MIC.

“The rigs are designed to high specifications and stringent quality control. We believe there is high demand for our rigs regionally and globally and the rigs can operate in drilling and workover assignments” said Ramzi Al-Sewaidi, Head of Investment Banking at First Energy Bank (BSC).

Today's Top Stories

Posted by

Thursday, March 8- 2012 @ 12:27 UAE local time (GMT+4) Replication or redistribution in whole or in part is expressly prohibited without the prior written consent of Mediaquest FZ LLC.

AME Info Services





Business DirectoryVIEW ALL

Search by name

Search by industry

Browse alphabetically



JobsVIEW ALL

Search for jobs

Latest Jobs