• Register
steel-plant

KSA shuts down two factories over faulty iron output

: Tuesday, June 24 - 2014 @ 01:47

The Saudi trade ministry has said its inspection teams have shut down two factories for manufacturing adulterated iron in Riyadh, Arab News has reported. The ministry seized more than 3,000 tonnes of iron worth over SR7m, which was later chopped into small pieces and melted in preparation for recycling, said the ministry. This move came as part of comprehensive campaign jointly carried out by the ministry and the Saudi Standards, Metrology and Quality Authority, which aims to target all iron factories in all regions of the kingdom and verify the conformity of the production lines with the requirements needed, as well as identify any attempts to cheat consumers.

Today's Top Stories

Posted by

Tuesday, June 24- 2014 @ 1:47 UAE local time (GMT+4) Replication or redistribution in whole or in part is expressly prohibited without the prior written consent of Mediaquest FZ LLC.

AME Info Services





Business DirectoryVIEW ALL

Search by name

Search by industry

Browse alphabetically



JobsVIEW ALL

Search for jobs

Latest Jobs